Special consideration went into the construction of this new 17,000 square foot facility. The site location was adjacent to an existing flood plain in the sensitive area of Church Creek watershed in Annapolis. The flood plain was dedicated to the county as part of this project and innovative and cost-effective storm water management methods were utilized to treat the proposed site while by-passing off-site drainage.


— Annapolis Subaru


— 2006